Search results

(1 - 20 of 56)

Pages

Attaching the gondola to the launch vehicle (DI02009)
Installing solar instrumentation at Mauna Loa (DI02163)
Solar panels fitted to the gondola (DI01647)
Walter Orr Roberts and the Climax coronascope, circa 1945 (DI02072)
One of Sunrise's solar panels (DI02012)
Sunrise telescope from the back (DI02024)
Testing equipment on the Sunrise gondola (DI02025)
Inspecting the Sunrise gondola (DI02023)
Elevator drive on Sunrise telescope (DI02022)
Testing the Sunrise elevator drive (DI02021)
Hercules vehicle delivers Sunrise to launch site (DI02013)
Attaching the Sunrise balloon and descent parachute (DI02014)
Getting the parachute ready (DI02010)
Preparations for Sunrise launch (DI02005)
Inflation of Sunrise balloon (DI02016)
Testing the Sunrise elevator drive (DI02020)
Laying out the Sunrise balloon (DI02015)
Inflation of Sunrise balloon (DI02017)
Sunrise telescope takes off (DI02018)
Sunrise launch vehicle (DI02011)

Pages